2007-06-18 N2 VL  3-8  40.09  71  1 1 40.74  2.50  Led, outfinished  VgsIcn  EinsArrn  RHPlrs  8   
2007-06-13 N11 VL  3-8  39.46  70  2 2 39.75  4.50  Overpowered stretch  PtsJckNCke  GcciGld  LzykJmes  8   
2007-06-07 N2 VL  3-8  39.80  70  20  41.22  8.70  Poor performance, in  TB  WhytlJdge  SlvrLcst  SolMgnla  8   
2007-06-01 N2 VL  3-8  40.16  70.5  16.5  41.33  4.50  Tiring thruout, insi  AbvThRst  ImUpInThAr  Lvngtn  8   
2007-05-24 N2 VL  3-8  40.34  69.5  2 2 40.54  3.70  Led til stretch, rai  SolMgnla  ImUpInThAr  WhytlShyla  8   
2007-05-19 N2 VL  3-8  39.56  71  40.04  7.80  Gaveway stretch, ins  Brna  ShrrnLne  SyThtAgn  8   
2007-05-12 N2 VL  3-8  39.80  70  .5 1 8.5  40.39  6.10  Bmpd far tn, caught  KbsSPrlrcs  Brna  SasSheTuf  8   
2007-05-05 N2 VL  3-8  39.32  70  18  40.57  7.70  Never close, rail  SyThtAgn  KbsSPrlrcs  TieBrkr  8   
2007-04-26 N2 VL  3-8  39.89  71  1 10  40.58  4.30  Out on top, faded  Snp Knws  RftpBdabng  VnaGld  8   
2007-04-14 N2 VL  3-8  39.88  71  3 4 39.88  4.30  Took charge early, r  TA  VnaGld  SlvrLcst  SyThtAgn  8   
2007-04-07 N2 VL  3-8  40.03  70.5  2 1 2.5  40.22  1.50  Crwd brk, outfinishe  SyThtAgn  Snp Knws  Plvka  8   
2007-04-04 N2 VL  3-8  39.42  71  3 1 11  40.19  8.80  Bumped 1st turn  PtCMkeIt  Plvka  RftpBdabng  8   
2007-03-28 N2 VL  3-8  39.60  71  2 2 .5  39.60  8.50  Rushed to lead, rail  RftpBdabng  Plvka  PtCMkeIt  8   
2007-03-21 N2 VL  3-8  39.84  71  8.5  40.43  10.50  Lasted for show, rai  PtCMkeIt  SyThtAgn  HnksFury  8   
2007-03-14 N2 VL  3-8  39.66  70  3 3 1.5  39.66  5.10  Box to wire, inside  TA  Gl'sCs  SasSheTuf  PtCMkeIt  8